Rainbow 2
continuing on
Taking down the trees shadowing the house.
A new front door, the old approach to the old entrance gone and hammering a ditch in the lava for power and water. Big boy toys!
The ditch is in and the CRR top soil is out. Ready for the conduit and water line.
Working on a new entrance to the property.
Placing the rocks as an entrance.
Got a little carried away with the big rocks.
The walk in shower is behind the new drain piping.
Conduit and water line in with new meter base. The power will come off the house and get there underground from here on. The smaller conduit will go to the well so we can shut the power off to the house and still have water for fire suppression.