Rainbow 3

The power has been connected to the new meter base.

Ready to back fill the ditches.

Starting the pump house / green house. The big windows will be removed from the house and will be used in the green house.

The pressure tank is in the big box in the back corner. The valving is in the smaller box.

Roof weathered in. Enough sheeting to make it wind resistant.

Framing in the new windows and doors.

The new windows will be smaller and more efficient and they will also open for cross ventilation.

The exterior sheeting is on and the old front door of the house makes a great door for the greenhouse.

The old front door removed and reframed and sheeted.

Leave a Reply